We were very pleased with the designs that the designer came up for us and their showroom workmanship looks really good. But went work is suppose to start, we didnt expect it to be such a huge difference.
1. Day of start work gets delay - requested to start work on 01/10/18 and agreed upon and when confirming again on 30/09/18 than was inform that their hacker couldnt do it and have to wait few more days.
2. Carpentry installation get delayed - agreed on 25/03/18 but only delivered on 27/03/18 for kitchen and living, bed room was even later
3. Floor tiles grouting workmanship was unacceptable.
We agreed on the color that the designer and tiler blended to match the floor tiles, but when the house was handed over to us, the grouting turned from beige to orangey. They claim it was due to chemical wash that the color changed. Do they not know that's the outcome if they were to do chemical wash or putting too much chemical for the wash? Some of our carpentry was installed before the grouting was touched up therefore if we were to ever dismantle the carpentry, the grouting would be different from the rest of the house. This is an example of poor coordination. Oh, ours was a resale 5RM HDB and the area was bigger than normal BTO but they only got 1 Malaysian guy to do the whole house, save cost?
4. Charged to remove door frame and make good - dismantled the door frame, but didnt smoothen it. Patches that cannot even be covered with paint. Even left a hack off patch and didnt touch up. Refer to pic
Overall, we had a hard time getting updates and to be frank we will never engage them again.
We made the final payment on 07/08/19 and till date (23/01/20), we have yet to receive the agreement. ID claims to need to speak to superior on certain points as the agreement was not what we agreed upon, but till date, no news.
Refer to picture for poor workmanship, esp on floor grouting.
Since they couldnt keep to the beige color that blends witht he floor tiles, we agreed to change to white, but still the grouting was uneven. When walking, you can feel the grouting line unevenness, some even higher than the tiles. Some grouting are having "holes" in between while mostly, the lines are not straight.
For kitchen top and bottom cabinet, they were not aligned, and we did make it clear to ID that we will be doing a bifold door. But when we ask for an explanation, they said it was due to structure issue (so we blame HDB), but yet, didnt they carpenter take proper measurement? Refer to pic for the difference between top and bottom cabinet.
Overall, we had a hard time getting updates and if you think you have lots of time and energy to be chasing and monitoring the work yourself, hire at your own risk. Even the manager try to brush our feedback off.
Designdesign and 3d turns out great
Workmanshipvery different from what you'll see in their showroom and from what they promise. even when you show disappointment/dissatisfaction, they will weight their cost above your disappointment
Customer Servicehaving to constantly chase for update, instead of being proactively updated. work end up getting delayed.