“Serious Concerns About Integrity, Workmanship and Quality Control”
I engaged Decor 8 for my HDB renovation, which began on 20 July 2026. As of 13 October 2026, almost three months later, the renovation remains at the wet works stage, with significant contractual works incomplete and rectification still ongoing. My experience has raised serious concerns about the firm's integrity, transparency, workmanship, quality control and project management. 1. Serious Worker Misconduct and Hygiene Incident Human waste and toilet paper were found in the master bathroom wastewater floor trap during renovation works. This was an unacceptable incident in my own home, requiring professional cleaning and extensive rectification, including hacking and reinstatement of affected areas. While Decor 8 later undertook rectification, the incident caused major disruption and raised serious concerns about worker conduct and site supervision. 2. Serious Concerns About Integrity and Transparency During hacking works resulting from the worker hygiene incident, I discovered that tile pieces had been used to build a wall extension where hollow blocks had been specified and quoted. What troubles me most is not simply the difference in construction materials, but that this substitution was never proactively disclosed to me. The discrepancy surfaced only because an entirely unrelated incident required hacking that exposed the internal construction. Had that not happened, I might never have known that the agreed specifications had not been followed. Although Decor 8 subsequently rectified the wall, this does not resolve my fundamental concern about integrity and transparency. As a homeowner, how can I be confident that other hidden works have been carried out according to the agreed specifications when this discrepancy was discovered only by chance? Overall: A Substantial Loss of Trust These are only two of several issues I have faced, but they are the most worrying because they raise fundamental questions about Decor 8's worker conduct, integrity and quality control. While I acknowledge the corrective works carried out, my concern goes beyond rectification. Significant issues were uncovered and pursued by me rather than proactively identified through the firm's supervision and quality control processes. Nearly three months after commencement, the renovation is still at the wet works stage, with substantial contractual works yet to start. The repeated disruption, additional hacking and prolonged delays have greatly undermined my trust in Decor 8's integrity, workmanship and project management. I am sharing my experience so prospective homeowners can make an informed choice.
This review is the subjective opinion of a Hometrust member and not of Hometrust.