We engaged Charisa as our ID back in Nov 2022.
Demolition works started on the first week of Jan, and the clearing of debris was completed before CNY. That's when our horror started. There were minimal works (i.e 2 days per week, and was told that it is normal) carried out after CNY, and for weeks, we asked if we were on schedule multiple times and were told, "Don't worry, we are on track." We insisted on the project timeline as we sensed something wrong and were given a shocking 2 month delay.
Only at that point did Charisa come clean and say that she miscalculated the timeline and needed more time to complete this project. Communication with Massing was horrible. Every time we gave an instruction, we always went up to our house in shock. They can't seem to get anything right.
We gave them all the appliances' dimensions and even arranged for physical items to be there, but they still got the dimensions wrong.
The carpentry discussion started somewhere in early February, and the design was only finalised in early April, bcos they needed more time as Charisa was overseas & then later fell sick. Adding on to more horror, just before carpentry fabrication, we were told that our kitchen design was not doable as they got the dimensions of the kitchen pipe wrong. Instead of it being at the tall cabinet, it is now at the location of our stove. The pipe has been exposed since January (3 months), and we were assured that she went up to do the measurement herself. But she could still get it wrong.
Even the sequence of work itself was wrong. When our new contractor took over, he questioned why the waterproofing was done so low for the kitchen. To our horror, we were told waterproofing was normally done before screeding, but massing did the opposite.
Being new homeowners with lots of ideas, Charisa did not advise on whether our ideas were workable or legal. When our new contractor took over, he spotted a lot of design flaws, which Massing gave no advice against. 1 is the tight space that will hinder washing machine replacement. On the 2nd, she routed aircon trunking into where my carpentry was supposed to be. If there is a leakage, the carpentry might be damaged due to that.
Even the electrician that was introduced (Nikson, YK Electrical Engineering) by Charisa was a horror. Our new contractor pointed out a lot of unsafe work that was done. Live cables were run in parallel to my water pipes in the bathroom.
Live wires were conveniently tucked into the aircon trunking instead of properly secured. Multiple sockets were looped to a single breaker.
Because of the inexperienced design by Massing, we had to fork out a lot more to correct those unsafe works that were previously carried out. And to make good the surfaces of the house. We practically tore down everything, but whole house plastering wasn't advised to be done by massing.
Charisa eventually asked if we wanted a designer change, and at that point, we told her that if having a designer change can resolve our issues, we will have a change in design. Luis, the manager, then gave us 2 choices. The first is he takes over the rest of the work and gives us a new timeline, and second, they will finish the on-hand work, and we find someone else to take over.
At that point, it was already the first week of April, and we were thinking of biting the bullet to let him finish through. But the replies he gave showed us that he had no interest in finishing up the project, and we decided that it was in our interest to part ways.
It took them almost 3 weeks to finalise the final quotation of works done by them and also the on-hand outstanding works (minor tiling and partition work).
16 weeks of renovation, and we don't have a house to stay. Our worst choice is to engage Massing Design. Utterly disappointed.